Debate On Including A New Theme To Present Website

We now have an current 7 web site that now we have developed a brand new search for.  Drupal Development Service new look was created on a development model of Drupal Development Service current web site.  We made some modifications to node fields and added a number of extra views on Drupal Development Service dev model.  Right here is the place Drupal Development Service debate exists, we’re prepared to maneuver this up to date theme to Drupal Development Service stay web site and I assume we have to simply transfer Drupal Development Service new theme over (ftp Drupal Development Service theme information to Drupal Development Service stay web site) and change Drupal Development Service DB on Drupal Development Service stay web site to make use of Drupal Development Service dev model (that has all Drupal Development Service node subject modifications and new views).  All different web site information stay unchanged so with Drupal Development Service new theme in place and Drupal Development Service DB up to date, it ought to simply be a matter of fixing themes on Drupal Development Service Appearances admin web page.  It’s being argued that we should always delete all Drupal Development Service information on Drupal Development Service stay web site and replica over all of Drupal Development Service dev information in addition to Drupal Development Service DB.  That works as effectively however I believe it’s greater than must be performed for this. Each websites are on Drupal Development Service identical model core & Drupal 10 modules. Simply needed others opinion on this to see if I’m lacking one thing.  Thanks! model Drupal 10 Upkeep and Assist Service  7.x Supply Drupal 10 Upkeep and Assist Service https Drupal 10 Upkeep and Assist Service//www.Drupal 10.org/taxonomy/time period/22/feed Supply Drupal 10 Upkeep and Assist Service Drupal 10 blender

This article was republished from its original source.
Call Us: 1(800)730-2416

Pixeldust is a 20-year-old web development agency specializing in Drupal and WordPress and working with clients all over the country. With our best in class capabilities, we work with small businesses and fortune 500 companies alike. Give us a call at 1(800)730-2416 and let’s talk about your project.

FREE Drupal SEO Audit

Test your site below to see which issues need to be fixed. We will fix them and optimize your Drupal site 100% for Google and Bing. (Allow 30-60 seconds to gather data.)

Powered by

Debate On Including A New Theme To Present Website

On-Site Drupal SEO Master Setup

We make sure your site is 100% optimized (and stays that way) for the best SEO results.

With Pixeldust On-site (or On-page) SEO we make changes to your site’s structure and performance to make it easier for search engines to see and understand your site’s content. Search engines use algorithms to rank sites by degrees of relevance. Our on-site optimization ensures your site is configured to provide information in a way that meets Google and Bing standards for optimal indexing.

This service includes:

  • Pathauto install and configuration for SEO-friendly URLs.
  • Meta Tags install and configuration with dynamic tokens for meta titles and descriptions for all content types.
  • Install and fix all issues on the SEO checklist module.
  • Install and configure XML sitemap module and submit sitemaps.
  • Install and configure Google Analytics Module.
  • Install and configure Yoast.
  • Install and configure the Advanced Aggregation module to improve performance by minifying and merging CSS and JS.
  • Install and configure Schema.org Metatag.
  • Configure robots.txt.
  • Google Search Console setup snd configuration.
  • Find & Fix H1 tags.
  • Find and fix duplicate/missing meta descriptions.
  • Find and fix duplicate title tags.
  • Improve title, meta tags, and site descriptions.
  • Optimize images for better search engine optimization. Automate where possible.
  • Find and fix the missing alt and title tag for all images. Automate where possible.
  • The project takes 1 week to complete.